We offer end-to-end services including site survey, system design, procurement, installation, commissioning, net metering, operation & maintenance for both on-grid and off-grid solar systems.
Yes, we install systems as per MNRE guidelines and work with empanelled vendors under the PM Surya Ghar Yojana and MSEDCL's Rooftop Solar Program, making you eligible for residential subsidies.
Evaluating the cost of solar repair involves assessing several factors related to the type of system, extent of damage, parts involved, and labor. Here's a step-by-step approach to understand and estimate solar repair costs in India (and broadly applicable elsewhere too):
Common issues include:
Component Typical Problems
Solar Panels Cracks, broken glass, hotspots, reduced output
Inverter Not turning on, error codes, low efficiency
Cables/Wiring Loose connections, rodent damage, short circuit
Mounting Structure Rust, tilt misalignment, or structural damage
Monitoring System Not syncing, inaccurate data
Net metering allows you to export excess solar power to the grid and receive credit on your electricity bill. MSEDCL supports net metering for systems up to 1 MW.
You’ll need:
• Recent electricity bill
• Aadhar card & PAN
• Property tax receipt or ownership proof
• Passport-size photo
• NOC from housing society (if applicable)
We assist in submitting all documents on the MSEDCL solar portal.
• Solar Panels: 25–30 years
• Inverters: 5–10 years
• Mounting Structure: Galvanized and corrosion-resistant, lasting 25+ years
Minimal. We offer AMC packages that include:
• Panel cleaning (monthly/quarterly)
• Electrical checks
• Remote monitoring (if applicable)
Yes, we have tie-ups with NBFCs and banks offering 20 – 25% down payment solar loans with tenures up to 7 years.
Approximately 60 –80 sq. ft. of shadow-free rooftop space is required.
For residential users in Maharashtra, the payback is typically 3–5 years, depending on your electricity usage and solar generation.
Yes, we specialize in multi-meter residential, commercial, and industrial solar EPC projects, including ground-mounted and hybrid setups.
For on-grid systems, approval from MSEDCL and net metering agreement is mandatory. We handle the entire process for you.
WhatsApp us
